Industrial Heating Magazine
 Home
 Advertising
 Subscribe
 ED+C Website
 Subscribe to eNewsletter
 Subscription Customer Service
 Online Collections
 Blog
 eNews Archives
 Digital Edition
 Web Exclusive Editorial
 EDU+Cast Webinars
 White Papers
 Career Center
 Videos
 Current Issue
 Cover Story
 Features
 Columns
 Industry Watch
 Products
 Resources
 Archives
 EPM Archives
 AEC Store
 Calendar of Events
 GREEN Book
 Radiant Flooring Guide
 Industry Links
 Product Info (FREE)
 Green Product Buzz Guide
 SF Info
 Special Sections
 AFE's Facilities Engineering Journal
Search in: EditorialProductsCompanies
Lighting Control Manages Costs Through Demand Response

June 24, 2009

ARTICLE TOOLS
EmailEmailPrintPrintReprintsReprintsshareShare

<div>Square-D-Powerlink-G3-intelligent-lighting-control-panelboard2.jpg</div>


Palatine, Ill. — Square D Powerlink G3 intelligent lighting control panelboards contain a schedule-based controller that can be configured to include a load-shed lighting sequence that activates based on a command from the building automation system, facility manager or even directly from the utility, the company reports. Both Square D Powerlink G3 2000 Level network-enabled and 3000 Level Web-enabled controllers can be remotely configured with a load-shed sequence by Schneider Electric, saving a facility manager time. www.squaredlightingcontrol.com.

Square D
Reader Service No. 101


|PrintEmail
  Comments (0)Post a Comment
 
 


Did you enjoy this article? Click here to subscribe to the magazine.
BNP Media
© 2010 BNP Media. All rights reserved. | Privacy Policy